
Hydril Pressure Control and VetcoGray diverters vent shallow gas flows from any bottom-founded or floating rig. Our diverter reliability stems from mechanical simplicity: One signal executes the diverting process, and an integral vent design eliminates extraneous valves and interconnections.
![]() |
Hydril Pressure Control Flow SelectorsUsed in diverter vent lines, flow selectors always keep the discharge line open and permit selection of a downwind line. They cannot be shut in. |
![]() |
Hydril Pressure Control FSFor floating drilling and platform rig service, with integral venting. Diverter loads through a 49-1/2" or 60-1/2" rotary table. Diverter closes on an open hole with no insert packer required. |
![]() |
Hydril Pressure Control FSPDiverter/BOP systems for bottom-supported offshore rigs incorporate integral venting. With no insert packer required, the diverter closes on an open hole or to handle tool and pressure tests. |
![]() |
VectoGray KFDJThe KFDJ diverter system is used on platforms and jackup rigs to protect against shallow gas kicks during drilling operations. In the event of a shallow gas kick, the diverter is energized to seal around the drill pipe and divert the gas safely overboard. |
![]() |
VectoGray KFDSThe KFDS diverter system is used on platforms and jackup rigs to protect against shallow gas kicks during drilling operations. In the event of a shallow gas kick, the diverter is energized to seal around the drill pipe and divert the gas safely overboard.. |
![]() |
VectoGray KFDS - COThe KFDS - CSO diverter has all the features of a KFDS diverter, however it can also close and seal over an open hole. |
![]() |
Hydril Pressure Control MSP-2000Applicable to surface installations, this lightweight, compact MSP provides both diverter and annular BOP functionality. |
![]() |
Hydril Pressure Control MSP 29-500Well suited for surface operations, this MSP has withstood the test of time, proving itself as both a diverter and an annular BOP. |
![]() |
Hydril Pressure Control Seal-All Diverter InsertEnsures safety on floating drilling rigs during completion and workover operations, when combinations of drill pipe and auxiliary lines in the well bore increase the difficulty of diverting gas that otherwise could reach the drill floor. |












